History Home  >  About Us  >  History
  • 2010
    In October, the sun earth (Fujian) new energy Co., Ltd was established.
  • 2011
    In January, a Workshop Foundation.
    In August, the production of 90MW polycrystalline silicon solar cell production line put into operation.
  • 2012
    In January, through the TUV certification.
    In May, through the ISO 9001:2008 quality management system certification, ISO14001:2004 environmental management system certification and OHSAS18001:1999 occupation health and safety management system certification.
    In December, 20MW Nanan sunshine PV system demonstration project was listed as the 2012 golden sun demonstration project
  • 2013
    In December, Nanan sunshine PV grid connected power system demonstration project success.
    Production of 210MW polycrystalline silicon solar cell production line put into production, total battery production capacity to reach 300MW.
  • 2014
    The contract to build and operate distributed PV power station project.

About Us | Contact Us |  Copyright @ Shine Earth New Energy.  by:Chinakewei